PROJECT NAME
1400 Page Mill | Net Zero, Developer-led
CLIENT
Morgan,Lewis & Bockius LLP
LOCATION
Palo Alto, California
MARKET SECTOR
BUILDING SIZE
86253 sf
PROJECT COMPLETION
2015
CONSTRUCTION TYPE
SUSTAINABILITY
THERMA-FUSER SYSTEM CONFIGURATION
AWARDS
- Gold Nugget Awards of Merit, Zero Net Energy Design, PCBC, 2016
- Structures Awards, Green Project, 2016
- The LEAF Awards,Best Sustainable Development, Shortlist, Leading European Architecture Forum, 2016
COLLABORATORS
- Architect: Form4 Architecture
- MEP: Integral Group
- Development Advisor: Point Energy Innovations
- GC: Devcon
ACUTHERM MANUFACTURER’S REP
Project Description
Located in one of the greatest entrepreneurial centers in the world, Stanford Research Park, it was essential for the building design to elevate the bar: sustainably, innovatively, and technologically.
Hanover Page Mill Associates selected a team of the world’s most innovative thought leaders to deliver an unparalleled sustainable environment for the tenant, Morgan, Lewis & Bockius LLP, one which embodies the values and spirit of this technology hub.
To achieve net zero electric energy on a developer-driven market rate project, the design team focused on a high performance building envelope, an optimized low-turndown HVAC system, and an aggressively sized photovoltaic system. Taken together, these strategies flipped the paradigm of PV on developer-led projects, allowing the building owner to realize an exception return on investment.
Project SheetTestimonial
“[1400 Page Mill] is at the forefront of innovative and sustainable building styles, re-setting expectations for dramatic improvements in tenant comfort and productivity.”